Birdi Systems Inc. (BSI) performed as the main consultant to the LAX Central Utility Plant (CUP) for assessment of the facility and its operations to recommend multiple system integration enhancements. The CUP provides LAX with hot and chilled water to run the HVAC system throughout the terminals and produces power to offset the electricity used to make the plant run. The assessment utilized BSI’s  SFOR™ systems engineering process to interview dozens of operational stakeholders, identify over eighty system gaps, and develop solutions to mitigate system risks.

 

Project Profile
  • Project Cost: $594,000
  • Start Date: July 2018
  • Completion: Feb. 2019
  • Cooling Capacity: 19,600 tons
  • Heating Capacity: 700,000 MBH
  • Power Generation: 8.4 MW

 

Project Role
  • Gap Analysis
  • Risk Mitigation
  • Systems Facility Operations Readiness
  • Technical Problem Solving
  • Program Development